Reference · Berlin-Kreuzberg
Hotel Berlin Kreuzberg
From site development to a long-term lease
Comprehensive support for the owner in developing a hotel project in Berlin-Kreuzberg – from site assessment and hotel concept through economic and construction planning to operator selection, the long-term lease and preparation of the hotel opening.
The focus was on aligning location, concept, investment and rent so that a market-oriented hotel emerges that is viable for an operator in the long term and economically sound for the owner.
- Project
- Hotel development, Berlin-Kreuzberg
- Client
- Owner of the site
- Role
- Adviser to the owner
- Outcome
- Successful long-term lease
Project stages
- Stage 1
Site, market and feasibility
- Stage 2
Hotel concept, business plan and investment
- Stage 3
Planning, equipment, construction and tendering
- Stage 4
Operator selection and lease agreement
- Stage 5
Handover, pre-opening and exit preparation
Services in the project
01
Site and location assessment
Assessing the suitability of the site for a hotel development.
Analysis of micro-location, accessibility, infrastructure, surroundings and relevant demand drivers.
02
Market and competition analysis
Research and evaluation of the Berlin hotel market and the competition in the relevant catchment area.
Examination of target groups, offer structures, room rates, occupancy potential and positioning options.
03
Feasibility review and development scenarios
Bringing together the location-related, planning and economic conditions.
Evaluation of possible hotel concepts, room numbers and space programmes, taking building regulations into account in coordination with the specialist planners.
04
Hotel concept and positioning
Developing a hotel concept suited to the location.
Defining target groups, quality level, room mix, service offer and public areas, and aligning them with the owner and potential operators.
05
Business plan and profitability calculation
Preparing a business plan with assumptions on occupancy, average room rates, revenues and operating costs.
Reviewing economic viability and deriving a sustainable rent level.
06
Investment and budget planning
Supporting investment planning, taking into account construction costs, equipment, ancillary project costs and contingencies.
Reconciling the total investment with the operating concept and the achievable rent.
07
Floor plan, space and operational planning
Advising on the planning of rooms, room categories, lobby, breakfast and lounge areas as well as back-of-house and ancillary spaces.
Optimising the space allocation with regard to guest experience, operational processes and economic use.
08
Equipment planning and operator requirements
Aligning the requirements for furniture, fit-out and operating equipment – including FF&E and OS&E.
Supporting budgeting and the allocation of responsibilities between owner and operator.
09
Coordination with contractors and trades
Bringing hotel operating requirements into planning and construction.
Supporting coordination between owner, architects, specialist planners, contractors, trades and the future operator.
10
Tenders and award decisions
Contributing to the preparation of hotel-related tenders and specifications.
Supporting bid comparisons and award decisions with regard to quality, functionality, cost and operational suitability.
11
Operator search and selection process
Identifying and approaching suitable hotel operators.
Preparing the project information, accompanying operator presentations and comparing the concepts and economic terms offered.
12
Review of operator quality and creditworthiness
Assessing the experience, references and financial capacity of potential operators.
Reviewing conceptual fit and the proposed securities as the basis for long-term cooperation.
13
Support in lease negotiations
Supporting the economic and operational contract alignment together with the legal advisers.
Addressing key points such as term, rent model, indexation, securities, maintenance, equipment and handover conditions.
14
Schedule and interface management
Coordinating project processes between planning, construction, equipment and operator takeover.
Tracking open decisions and coordinating the interfaces relevant to handover and opening.
15
Handover and defect tracking
Supporting the handover to the operator.
Helping to document outstanding work and defects and coordinating their further handling with the responsible project partners.
16
Pre-opening and preparation for operation
Supporting opening preparation on the owner’s side.
Aligning the structural, equipment-related and organisational prerequisites for the hotel operator’s takeover and start of operation.
17
Long-term lease and preparation for a later exit
Successfully supporting the long-term lease.
Structuring the relevant property, project and contract documents as the basis for ongoing asset management, a later data room and due diligence by potential investors.
Project outcome
Positioned for the market, leased for the long term
Development of a market-oriented hotel project and a successful long-term lease.
Through coordinated concept work, economic planning and contractual structuring, key prerequisites were created for sustainable operation and a later successful exit.
Scope of work
- Site and market analysis
- Feasibility and development scenarios
- Hotel concept and positioning
- Business plan and rent level
- Investment and budget planning
- Space and operational planning
- FF&E and OS&E
- Construction and tender support
- Operator search and review
- Lease negotiations
- Handover and pre-opening
- Exit preparation
In this way, I supported the owner from the potential of a site to a hotel project secured by a long-term lease.
Assessing a site for a hotel?
Talk to Johannes Fritz Groebler about location, concept, profitability and finding the right operator.